Results

  • Revitalisation of the alignment of the former Parenzana railway line, increased number of sports events, higher public awareness of the values of Parenzana and significance of the project.
  • Establishment of guidelines for the development of Parenzana.
  • Production and mounting of 131-metre long safety rails on the Freski Viaduct.
  • Production and mounting of safety rails on two Parenzana viaducts.
  • Rebuilding of two destructed bridges on the Parenzana route.
  • Arrangement of solar lighting in Parenzana tunnels.
  • Preparation of master plans and bills of costs for the reconstruction of five destructed bridges.
  • Drawing up of a detailed plan, cross sections and a bill of costs by phases for the revitalisation of the Poreč-Vižinada section.
  • Production and mounting of a safety rail on the Sabadin Viaduct.
  • Arrangement of viewpoints on the Parenzana route.
  • Arrangement of the Parenzana Park next to the route, equipped with benches and information boards.
  • Establishment of legal and administrative preconditions for the conceptual solution of the Parenzana Sports and Recreation Centre.
  • Mounting of a safety rail on the Oprtalj Viaduct.
  • Arrangement of new bicycle path sections at Koper, Izola and Piran.
  • Rebuilt old railway route for recreation purposes at Koper and Izola.